Project Description

Fairtax is an industry leader in obtaining government funding in Canada. Our dedicated team of Funding Specialists understands the intricacies of government grant and incentive programs, optimally positioning your organization to secure government funding. We cut through the confusion, uncovering the specific financial resources that allow you to focus on growing through innovation, training employees, and taking your operations to the next level.

Saskatchewan Lean Improvements in Manufacturing (SLIM)

The Saskatchewan Lean Improvements in Manufacturing (SLIM) program provides funding assistance to agri-businesses for adoption of best practices, new state-of-the-art technologies and processes that stimulate significant improvements in productivity and efficiency.

Funding

Infrastructure Projects: 50% of eligible expenditures to a maximum payment of $500,000 (including the amount provided for the Efficiency Analysis).

Deadline

Applicants will need to submit applications for pre-approval by May 15, 2022 and submit claims by the date specified in their contract.

Eligible Applicants

  • Agri-businesses involved in value-added processing of Saskatchewan agricultural products
  • A commercial enterprise located in Saskatchewan
  • Incorporated in Saskatchewan or federally and filing income tax in Saskatchewan
  • An existing facility that has been in operation for a minimum of two years

Ineligible Applicants

  • Facilities where the retail environment is larger than the processing area
  • Publicly funded facilities; and Processors of seafood or fish

Efficiency Analysis

  • An Efficiency Analysis is a review of the facility’s current production methods and identifies where efficiencies can be gained or new technologies adopted to increase productivity
  • The Efficiency Analysis must be undertaken by an independent third party consultant that has experience and knowledge of efficient manufacturing principles, productivity and systems efficiency. The Ministry does not provide referrals or recommendations on consultants
  • Expenditures for the Efficiency Analysis will be eligible for rebate even if the applicant does not proceed with an Infrastructure Project application or if the Infrastructure Project is not approved
  • Receiving approval to undertake an Efficiency Analysis does not imply approval of the applicant’s Infrastructure Project

Eligible Expenditures

  • Consultant fees
  • Expenses directly related to the cost of developing the assessment for options of
    • Implementing automation; efficient manufacturing processes; or technology, including design

A Completed Efficiency Analysis Must Include a Detailed Description of the Following

  • Current production line
  • A schematic of the current process flow diagram and of the existing building
  • Current issues facing the facility and how the issues need to be addressed
  • Proposed solution to the issues
  • Any equipment replacements, equipment modification, and/or facility modifications that must be made or training required.  This should include a schematic or process flow diagram
  • Description of the current levels of productivity and gains that will be achieved as a result of the proposed solution
  • A summary of the above items

Infrastructure Projects

On a case by case basis the Ministry will consider the use of an existing  Efficiency Analysis, given that it was completed recently and no major changes to manufacturing or processing have occurred. Infrastructure Project applications must include:

  • Copy of Efficiency Analysis
  • All proposed equipment replacements, equipment modifications, facility modifications to be made, or training required
  • Estimated costs and a projected timeline for each of the proposed items. Higher priority items should be considered first
  • Pictures of the current equipment to be replaced or modified, or the area to be modified
  • Documentation which shows the applicant’s ability to financially contribute the necessary funds to the project. This could be a letter of financial commitment from their financial institution or financial statements
  • All applicants approved for Infrastructure Project funding will be required to sign a contract before the project commences

Submitting Claims

  • Applicants must submit claims to the Ministry of Agriculture Programs Branch
  • Total eligible Infrastructure Project expenditures must be a minimum of $200,000. Equipment and materials must be installed and fully paid for when claimed. SLIM program requirements must be met prior to payment of any claim
  • Applicants are responsible for obtaining and complying with any permits or approvals required and for incorporating any relevant mitigation measures for your project

Ineligible Expenses

  • Activities or investments that have received funding under the Saskatchewan Value-Added Initiative Funding Program
    Interim claims for Efficiency Analysis expenditures
  • New buildings, additions or building modifications
  • Labour, wages or travel costs of applicant or employees (non-third party transactions)
  • Use of own equipment
  • Taxes, brokerage, legal or interest/financing costs
  • Business or marketing plan development
  • Office equipment
  • Computers and related hardware and software
  • Farm equipment, cars, trucks, tractors, trailers, forklifts or other mobile motorized equipment
  • Purchase of capital items such as land or buildings
  • Production disturbances
  • Equipment and supplies requiring replacement on an ongoing basis
  • Items considered being regular repair or maintenance
  • Items related to the addition of processing lines and equipment for the sole purpose of producing new products
  • Invoices with eligible items totaling less than $100

CONTACT US

Not sure if your organization qualifies for Government funding? Contact us today at (905) 822-4474 or fill out the form below to schedule a free assessment.

Find Funding Now

Generate a free report that lists the top 5 current, high probability, programs that your organization may be eligible for.